Guided demo / about 5 minutes

Three sites.
One refresh.
Your judgement.

Meet Floni in Discovery, then see how a human challenge changes a decision in the current Design workspace.

You'll describe a network, answer Floni, correct the captured brief and review Mako's design reasoning.

Fictional demo · no account · no uploads

Start the demo
Floni invites you into the guided demo.

A small demo of a bigger workflow.

This guided replay uses synthetic data and selected screens from the current workflow. Your clicks affect the demo only; they do not run live AI or save a live project.

Follow the demo, step by step.

This text walkthrough is always available. All people, sites and quantities are fictional.

  1. Set the project context

    Cedar Services is refreshing three branches: 110 staff, 4 reported switches and 8 reported APs. Switching and Wi-Fi are in scope; WAN gateways stay. The planning ceiling is EUR 45,000.

  2. Describe the existing network

    The manual description records current needs, a December 2026 target and 25% growth over three years. No device models, configurations or surveys are verified.

  3. Work through gaps with Floni

    Floni asks for a physical survey and missing constraints. A supplied demo reply confirms a Site B maintenance window: Saturday 18:00–22:00, with checks before Monday 08:00. It remains a user statement.

  4. Review and correct the brief

    Review Business context, Existing network, Requirements and Constraints. Save a vendor-independent requirement correction. Discovery approval confirms the captured record for preliminary discussion; it does not approve deployment.

  5. Inspect the inventory handoff

    What we found contains 0 devices. The manually reported switches and APs are not scanned inventory. Continue to Design using the corrected Discovery brief only.

  6. Challenge, defer and decide

    Defer lifecycle decision DEC-003 because models and support status are unknown. Challenge DEC-002's premature switching-layer enforcement. The revised reasoning retains isolation as a requirement and defers the enforcement point. Accept that corrected decision or defer it. Eighteen other decisions remain open.

Request early access